Weekly Progress Report 11/9 - 11/15

Progress:
-         This week we completed further research on both the launching mechanism and easyC V4. As for the launcher, we’ve completely ruled out any electromagnetic mechanism as all research indicates that currently there is no technology that allows for an electromagnet strong enough to pull something towards it from very far. Today, Mr. Lin purchased our previous materials list, shown in a prior blog post. As for easyC, we’re still working through reading and watching tutorials.
Problems:
-         Not long after purchasing the materials for the launching mechanism, we asked Mr. Lin if we would be able to bring in a power drill to work on building the launching mechanism. We then received a copy of the school code on what’s defined as a weapon, and we may have to scrap our launcher design again. We will meet with Mr. Lin ASAP to discuss this.
Plan:
-         For this week we plan to start work on the launcher, possibly the robot as well. We also plan to continue our easyC research. The launcher assembly will depend on what we discuss with Mr. Lin regarding the school’s rules.


No comments:

Post a Comment